| Mon Mar 23 01:44:33 2026 | ||
|---|---|---|
| Storage Ring | APS Accelerator Operations Data | |
| Machine Status | Delivered Beam | |
| Storage Ring Current (mA) | 130.16994 | |
| Operating Mode (desired, actual) | USER OPERATIONS , Delivered Beam | |
| Fill Number | 37.000 | |
| ACIS Shutter Permit, Number of Shutters Open | ON , 36.000 | |
| Closed Orbit Feedback (global, vert, horiz) | Off , Off , Off | |
| Orbit Correction (global, vert, horiz) | 0.0000 , Non-Steering Mode , Non-Steering Mode | |
| XFD Messages | ||
| Operators | Hotham,Novencido | |
| Floor Coordinator | Ashley Wayman (2-0101) | |
| Fill Pattern | 48 bunches/High coupling/Swap-out | |
| Problem Info | 22:17 - Swap-out resumed. | |
| Dump/Trip Reason | 22:13 - Swap-out paused due to an | |
| Next Fill Info | Target Fill: 130mA | |
| Message7 | ||
| Message8 | ||
| Message9 | ||
| BL13 | ||
| BL13:ActualMode.VAL | State Unknown | |
| BL13:srCurrent.VAL | 409.50 | |
| BL13:srLifetime.VAL | 160.00 | |
| BL13:BeamPresent.VAL | On | |
| ID-A Shutter Permit | Enable | |
| Beam Position Monitors (APS-U) | ||
| BM Vertical Position, Angle | -2.442e-04 , -0.2442599 | |
| ID: X-ray BPM Vertical Position, Angle | -0.0307410 , -21.555593 | |
| ID: x-ray BPM Horizontal Postion, Angle | 0.0835655 , 4.3652542 | |